Heating plant heats up Ramstein
Mathias Barz (left) and Uli Jung perform a bi-annual inspection on a heating burner that was disassembled in Heat Plant One Feb. 12, 2009, at Ramstein Air Base. The heat plant has been supplying heat to the buildings of Ramstein since 1997 and continues to help support the mission. (U.S. Air Force photo by Senior Airman Amber Bressler)