Photos

Keyword: Category: Tag: Sort By:
A German contractor mixes tar that will be placed in the drains of the flightline on Ramstein Air Base, Sept. 21, 2017. Once on-site, the tar was blended together into bigger containers.


Flightline construction resumes

A German contractor mixes tar that will be placed in the drains of the flightline on Ramstein Air Base, Sept. 21, 2017. Once on-site, the tar was blended together into bigger containers. (U.S. Air Force photo by Airman 1st Class Milton Hamilton Jr.)

Related Imagery